West Ouachita High School Soccer & Track Field House
Category: Athletics, K-12

Project Detail

LOCATION
West Monroe, LA
CLIENT
Ouachita Parish School Board
STATUS
Complete

TBA Studio designed a new end zone facility at the south end of the football stadium at West Ouachita High School, part of Ouachita Parish Schools. The building was carefully fit within tight existing site conditions and provides new locker rooms for both soccer and track programs, along with coaches’ offices and a weight room.

Exterior materials were selected to match the existing campus architecture while introducing modern metal panels to refresh the look and enhance durability. A curtain wall system brings natural light deep into the facility, creating a bright and open environment for student-athletes.

Interior finishes include resilient rubber flooring in the weight room for performance and longevity. The design also incorporates exterior signage and illuminated wall graphics that strengthen school identity and provide a striking visual effect for nighttime events.

Team
Meet the Team

Meet our team of problem-solvers who create award-winning designs that welcome, inspire, and excite.

careers
Take a Giant Leap Forward

Join the team that’s transforming our communities through design.